Steradian ESD Consultants

142-144 Frankston Dandenong Road

Industrial Storage Facility Extension

Project Overview

At Steradian ESD Consultants, we recently completed a sustainable and efficient design for the extension of an industrial storage facility located at 142-144 Frankston Dandenong Road. This project required our expertise in Green Travel Planning and the development of a Sustainable Management Plan to meet the stringent requirements for council approval under the Built Environment Sustainability Scorecard (BESS) framework. Our challenge was to ensure compliance while tailoring the design to meet the specific operational needs of the facility.

Given the low staffing levels in the storage facility, daylight access was intentionally excluded from the design. Instead, motion-sensor lighting was implemented, ensuring lights are activated only when necessary. This approach minimized energy consumption and aligned with energy efficiency principles, reducing waste while meeting the building’s functional requirements. To further enhance energy performance and meet compliance standards, we conducted detailed façade glazing calculations as part of our energy efficiency strategy.

Water management was another critical component of the project. By developing a MUSICX model, we ensured effective water usage and compliance with council requirements for stormwater quality. Combined, these strategies delivered a design that balanced practicality with sustainability, meeting the objectives of the Sustainable Management Plan and Green Travel Plan.

By addressing these challenges, we successfully achieved council approval and delivered a project that balances sustainability with functionality. If you’re working on a similar development, let us assist you with sustainable design, Green Travel Planning, and the creation of a comprehensive Sustainable Management Plan (SMP). Contact us today for a consultation!

Industrial Storage Facility Project in Frankston

Project Information

DEVELOPMENT TYPE:

Industrial Storage Facility Extension

SERVICES:

Green Travel Plan, Sustainable Management Plan

PROBLEM:

Needed council approval with the use of BESS

UNIQUNESS:

  • Daylight access excluded due to low occupancy.
  • Because it was a storage facility that had little to no staff
  • Motion-sensor lighting minimizes energy use.
  • Design aligns with energy efficiency and project needs.
  • Lighting requirements for the building


ENERGY:

Façade glazing calculations required

WATER:

Musicx model required

Have a project like this? Contact us for a consultation!